Topological Sort
Order the nodes of a directed acyclic graph with Kahn's algorithm or DFS, and use it for scheduling and dependency problems.
Intermediate · about 5 hours · difficulty 3/5
Learn first: Graph Representation, BFS and DFS
Topological sort lists the nodes of a DAG so that every edge goes from earlier to later. Any problem about prerequisites, build orders or dependencies is probably this.
Two algorithms
- Kahn's algorithm (BFS): compute in-degrees, push all zero in-degree nodes, pop and decrement neighbours. If you process fewer than n nodes, there is a cycle.
- DFS-based: push a node onto a stack after visiting all its descendants; reverse the finishing order.
Key patterns
- Cycle detection in a directed graph (Course Schedule).
- Producing an order (Course Schedule II).
- Alien Dictionary: build edges from the first differing character of adjacent words.
- Longest path in a DAG via DP over the topological order.
- Find Eventual Safe States: reverse the graph and run Kahn's.
- Parallel scheduling: minimum semesters = number of BFS levels (Parallel Courses).
Pitfalls
- In Alien Dictionary, missing the invalid case where a longer word appears before its own prefix.
- Using undirected cycle detection logic on a directed graph.
You are ready to move on when you can implement Kahn's algorithm from memory and use it to detect a cycle.
Key concepts
- DAGs and in-degree
- Kahn's algorithm
- DFS finishing order
- Cycle detection in directed graphs
- Alien Dictionary
- DP on a DAG
Mini project
Solve these 8 in 7 days, log time and pattern: Course Schedule, Course Schedule II, Find Eventual Safe States, Alien Dictionary, Parallel Courses, Minimum Height Trees, Longest Increasing Path in a Matrix, Course Schedule (CSES).
Check yourself
How does Kahn's algorithm tell you that the graph has a cycle?