# Incident Response and On-Call

> How to run an incident from first alert to resolution with clear roles and communication, and how to build an on-call rotation people can sustain. Free notes,...

Canonical: https://www.internhack.in/roadmaps/tracks/devops/incident-response
Last updated: 2026-11-28

How to run an incident from first alert to resolution with clear roles and communication, and how to build an on-call rotation people can sustain.

Intermediate · about 4 hours · difficulty 3/5

Learn first: [Alerting That Does Not Burn People Out](https://www.internhack.in/roadmaps/tracks/devops/alerting)

Incidents are inevitable; chaos during them is optional. A shared, rehearsed process lets people focus on fixing the problem.

### Lifecycle of an incident

1. **Detect**: an alert, a customer report or a failed deploy.
2. **Declare** early. Opening an incident is cheap; waiting is expensive. Assign a **severity** from an agreed scale.
3. **Mitigate first**: restore service by rolling back, failing over, scaling up or disabling a feature flag. Root cause can wait.
4. **Communicate** on a regular cadence in one channel and on a status page.
5. **Resolve**, confirm with metrics, then hand off to the postmortem.

### Roles

- **Incident commander**: coordinates, decides, delegates; does not debug.
- **Operations / subject-matter leads**: investigate and apply changes.
- **Communications lead**: updates stakeholders and customers.
- **Scribe**: keeps a timeline of observations and actions.

Small incidents may have one person wearing several hats, but the roles still exist.

### Sustainable on-call

- Rotations of at least six to eight people, with primary and secondary.
- Clear **escalation** paths and handoff notes at shift change.
- Target a low number of pages per shift; track it and fix noisy sources.
- Compensate on-call and protect recovery time after rough nights.
- Keep runbooks, dashboards and access ready before the shift, not during the incident.

**Good enough to move on:** you can run a mock incident as commander with a timeline and status updates, explain why mitigation comes before root cause, and describe what a healthy rotation looks like.

## Key concepts

- **Severity levels and declaring**
- **Mitigate before root cause**
- **Incident commander and roles**
- **Status pages and stakeholder updates**
- **On-call rotations and escalation**
- **Handoffs and toil tracking**
- **Incident tooling: PagerDuty, incident.io**

## Mini project

Run a tabletop exercise with friends or classmates: break your demo app on purpose, play incident commander, keep a timestamped timeline and post three status updates until it is mitigated.

## Check yourself

Thirty minutes into an outage, the team has a likely root cause but a fix will take an hour, while a rollback takes five minutes. What do you do, and why?

## Free resources

- [Managing Incidents (SRE Book)](https://sre.google/sre-book/managing-incidents/) (Google SRE)
- [Being On-Call (SRE Book)](https://sre.google/sre-book/being-on-call/) (Google SRE)
- [PagerDuty Incident Response guide](https://response.pagerduty.com/) (PagerDuty)

Previous: [SLIs, SLOs and Error Budgets](https://www.internhack.in/roadmaps/tracks/devops/slo-error-budgets) · Next: [Blameless Postmortems](https://www.internhack.in/roadmaps/tracks/devops/postmortems)

## More in Site Reliability Engineering Practice

- [Incident Response and On-Call](https://www.internhack.in/roadmaps/tracks/devops/incident-response)
- [Blameless Postmortems](https://www.internhack.in/roadmaps/tracks/devops/postmortems)
- [Capacity Planning, High Availability and Disaster Recovery](https://www.internhack.in/roadmaps/tracks/devops/reliability-capacity)
- [Chaos Engineering](https://www.internhack.in/roadmaps/tracks/devops/chaos-engineering)

## Related

- [Roadmaps](https://www.internhack.in/roadmaps)
- [DevOps Engineer Roadmap](https://www.internhack.in/roadmaps/tracks/devops)
